Tianjia New Material Technology (Hubei) Co., Ltd
Email roczeng@hbust.edu.cn TEL: 86--13026127338
Home
Home
>
Activities-Event
>
Company news about Customized Large Automatic Air Shower for Laboratories and Cleanrooms
LEAVE A MESSAGE

Customized Large Automatic Air Shower for Laboratories and Cleanrooms

2026-05-07

Latest company news about Customized Large Automatic Air Shower for Laboratories and Cleanrooms
Tianjia Large Automatic Air Shower: Efficient Guardian for Large-Scale Dust-Free Scenarios
 
In large clean production bases of pharmaceuticals, food and other industries, high-frequency and large-flow personnel and material flow require higher purification efficiency and environmental stability. Tianjia’s large automatic air shower provides efficient and worry-free protection with customizable large-size channels and fully automatic operation.
 

I. Core Technical Highlights

 
  1. Large Customizable Channels for Large-Scale Scenarios
     
    Supports 1–4m channel length, accommodates multiple people simultaneously, 3 times higher passage efficiency than ordinary small air showers. 18–72 360° rotating nozzles, full coverage without dead corners.
     
  2. Fully Automatic Operation, Worry-Free and Efficient
     
    PLC intelligent control and photoelectric sensors, automatic sensing shower, interlock, LED display, full automation without manual intervention, 60% lower misoperation rate than manual models, adapting to high-flow large workshops.
     
  3. Ultra-High-Efficiency Purification, Deep Dust Removal
     
    Primary + HEPA two-stage filtration, 99.995% efficiency for 0.3μm particles, wind speed ≥20m/s, efficiently removing dust and microorganisms within 0–99 seconds, one order higher purification precision than ordinary air showers.
     
  4. High-Quality Materials, Stable and Durable
     
    SS/SUS304 stainless steel and ivory static powder coated steel, corrosion-resistant, easy to clean, modular structure, 2–3 times longer life than ordinary carbon steel models.
     
 

II. Quick Selection Guide

 
  1. Large Pharmaceutical Production Bases: 72 nozzles + 4m channel + GMP, for large-flow purification.
  2. Food Processing Industrial Parks: 54 nozzles + 3m channel + stainless steel floor, for high-humidity scenarios.
  3. Precision Electronics Manufacturing Centers: 36 nozzles + 2m channel + low noise, for high-flow chip manufacturing.
  4. Biomedical Laboratory Clusters: 18 nozzles + 1m channel + intelligent control, meeting protection needs.
 

III. Installation Process

 
  1. On-site measurement and configuration confirmation.
  2. Factory production of large air shower units.
  3. Modular assembly with electrical and interlock installation, 3–5 days.
  4. Wind speed, filtration and automatic operation testing; third-party reports; training and warranty.
 

IV. Daily Usage Notes

 
  1. Replace primary filters every 3–6 months, HEPA filters every 1–2 years.
  2. Clean nozzles regularly with compressed air.
  3. Inspect PLC, sensors and interlock quarterly.
  4. Adjust shower time via touch relay for optimal effect.

Contact Us at Any Time

86--13026127338
No. 5,17th Floor, Building 1, Block K7, Evergrande Yujingwan, Hanyang District, Wuhan, China
Send your inquiry directly to us