Tianjia New Material Technology (Hubei) Co., Ltd
Email roczeng@hbust.edu.cn TEL: 86--13026127338
Home
Home
>
Activities-Event
>
Company news about Advanced Cleanroom Double Door Air Shower System
LEAVE A MESSAGE

Advanced Cleanroom Double Door Air Shower System

2026-05-07

Latest company news about Advanced Cleanroom Double Door Air Shower System
Tianjia Advanced Double Door Air Shower System: Core Safety for Aseptic Environments
 
In pharmaceuticals, food and other ultra-high-cleanliness industries, cross-contamination is a key risk to product quality. Tianjia’s advanced double door air shower system provides dual protection with physical interlock and 99.99% high-efficiency purification.
 

I. Core Technical Highlights

 
  1. Double Door Interlock, Upgraded Physical Protection
     
    Electronic interlock design, entrance and exit cannot open simultaneously, completely blocking direct connection, 80% lower cross-contamination risk than single-door models, complying with GMP, ISO standards.
     
  2. Advanced Purification, Deep Dust Removal
     
    Primary + HEPA two-stage filtration, 99.99% efficiency for 0.3μm particles, 360° rotating nozzles and wind speed ≥20m/s, 全方位 removing dust and microorganisms within 0–99 seconds, 40% higher efficiency than ordinary air showers.
     
  3. Multi-Spec Adaptation, Advanced Customization
     
    18–72 nozzles, 1–4m channel length, full customization of size, power and function, 70% higher adaptability than fixed models, meeting high-end clean needs from laboratories to large workshops.
     
  4. High-Quality Materials, Stable and Durable
     
    SS/SUS304 stainless steel and ivory static powder coated steel, corrosion-resistant, easy to clean, modular structure, 2–3 times longer life than ordinary carbon steel models.
     
 

II. Quick Selection Guide

 
  1. Pharmaceutical Production Workshop: 54 nozzles + interlock + GMP, meeting aseptic standards.
  2. Food Processing Clean Zones: 36 nozzles + stainless steel floor + EVA high sealing, meeting food hygiene.
  3. Precision Electronics Workshop: 18 nozzles + low noise + fast shower, for high-flow chip manufacturing.
  4. Biomedical Laboratory: 72 nozzles + 360° nozzles + intelligent control, meeting high-end protection.
 

III. Installation Process

 
  1. On-site survey and configuration confirmation.
  2. Factory production of air shower units.
  3. Modular assembly with electrical and interlock installation, 2–3 days.
  4. Wind speed, filtration and interlock testing; third-party reports; training and warranty.
 

IV. Daily Usage Notes

 
  1. Replace primary filters every 3–6 months, HEPA filters every 1–2 years.
  2. Clean nozzles regularly with compressed air.
  3. Inspect interlock and PLC quarterly.
  4. Adjust shower time via touch relay for optimal effect.

Contact Us at Any Time

86--13026127338
No. 5,17th Floor, Building 1, Block K7, Evergrande Yujingwan, Hanyang District, Wuhan, China
Send your inquiry directly to us